This project for CSX Transportation included the design and construction of a new single track railroad bridge approximately 350 feet long over the Overpeck Creek in New Jersey.
The work for this project consisted of the removal of an existing timber trestle and the replacement of a new structure which consisted of pile bents; concrete pile cap and steel girders; timber deck and track bedding were also included. Difficult access to the work area required the design and construction of a temporary work trestle that was installed alongside the proposed bridge. The temporary trestle provided access for all operations including pile driving and steel erection.
5.83
CSX Transportation
AECOM
$3.7 Million
March 2002
November 2002