



ECCO III Enterprises, Inc. was awarded New York State Department of Transportation (NYSDOT) Contract D263682 to construct and implement various improvements along the I-287 corridor in conjunction with the completion of the Mario Cuomo Bridge.
The NYSDOT-sponsored Lower Hudson Transit Link was a NYS-sponsored program of integrated projects that supported traffic, transit, and safety improvements in Rockland and Westchester Counties via technology implementations and transportation strategies to deliver reliable and improved travel in the I-287 corridor. The overall program was guided by the goal of addressing current operational needs as well as future demands on the system while maximizing existing infrastructure to: “improve the availability, accessibility, and quality of transit service in the Lower Hudson Valley; increase access to jobs, housing, and other transportation options; and increase the attractiveness, utilization, and quality of local transit and the regional inter-county network of transit services.” (Lower Hudson Transit Link Phase I, New York State, www.dot.ny.gov/LHTL.)
The program made use of Integrated Corridor Management (ICM), which used sensors to collect real-time traffic information that was used to manage the network with greater efficiency by controlling traffic flow and congestion through remote signal timing control, ramp metering, and traveler notifications. The program also included various improvements that addressed accessibility and safety for bicyclists and pedestrians in the network.
D263682
New York State Department of Transportation (NYSDOT)
ARUP Group
$55.8 Million
May 2018
October 2024
Subscribe now to keep reading and get access to the full archive.