Secondary System Rehabilitation Yonkers Joint Wastewater Treatment Plant

The scope of work included the complete blasting and recoating of the existing Secondary Aeration piping, along with the replacement of two (2) 54-inch couplings; the replacement of five (5) cooling water pumps and associated automatic strainers, piping, and valves; the replacement of the existing plant water system with a pre-engineered skid-mounted system, including new pumps, valves, flow meters, and control panels; the replacement of the existing High-Pressure Washdown system with a pre-engineered skid-mounted system, including new pumps, valves, flow meters, and control panels; the replacement of the existing Compressed Air System, including the compressors, dryers, holding tanks, controls, and piping; and the upgrade of electrical equipment associated with the new equipment.

 
Contract No.

16-512

Owner

County of Westchester - Department of Public Works

Engineer of Record

H2M Architects & Engineers

Contract Value

$5.86 Million

Award/Notice to Proceed

January 2023

Contract Completion

March 2025

Discover more from ECCO III Enterprises, Inc.

Subscribe now to keep reading and get access to the full archive.

Continue reading