The project involves raising the existing structure and constructing a new one above the design flood elevation, including a new Electrical Building to house the power and control systems. The scope encompasses replacing pumps, motors, piping, and valves, as well as installing new wet well mixers and controls. Concrete pads, dry well platforms, stairs, and railings will be replaced, while existing concrete will be rehabilitated.
Additional improvements include replacing the fence and gate, repaving, and upgrading the heating and ventilation systems. Plumbing systems, such as the backflow preventer and dry well sump pump and piping, will also be replaced. Furthermore, instrumentation equipment, control panels, and electrical systems—including lighting, conduit, wiring, and the emergency generator—will be updated.
22-526
County of Westchester - Department of Public Works
ARCADIS
$6.8 Million
October 2024
Ongoing